Our process
Four steps from idea to sited room
Nothing hidden and no mess. This is how your conversion goes from first idea to finished garden room, step by step.
Idea to sited, step by step
The four steps
- 01
Talk it through
Let us know what it’s for, roughly how big, and where in the garden it’ll go. One phone call or message gets things moving, and you’ll hear back within one working day.
- 02
Your design and quote
We plan the build around the way you’ll use it, then send an itemised quote that spells out what’s included, the extras and the lead time. Every figure is clear.
- 03
Built by our team
Our team of five builds it by hand in our workshop, using a container from our own stock. It’s insulated, lined, wired and finished with the care of a kitchen fitter.
- 04
Delivery day
A HIAB lorry lifts it over the fence and lowers it onto levelled pad stones. It’s sited in a day with no foundations, and you can use it straight away.

The practical side
Delivery, siting & the details
Siting and foundations
The container is structural by itself, so most gardens don’t need conventional foundations. We set it on a simple prepared base or levelled concrete pad stones, and if your ground is soft or sloping we’ll recommend the right base. Then the unit is craned into place and levelled.
Access and HIAB delivery
Delivery is by HIAB lorry anywhere in the country. Its crane lifts the container over hedges, walls and fences, so the lorry doesn’t have to reach the exact spot. We go through access with you before the day, so awkward or tight sites are planned in advance rather than found out on the morning.
How long it takes
With our own container stock, your build begins once it’s agreed, without waiting for a supplier. The exact timescale depends on size and spec, and we confirm it in your quote. [TBC: typical turnaround.]
Deposit and payments
[TBC: deposit and stage-payment terms to confirm.] Before any work starts, your written quote lays it all out, including what you’ll pay and when. Straight answers, plain English
Straight answers, plain English
How it works: questions
Will I need planning permission for a container conversion?+
Usually not, if it’s a garden building used during the day, like a gym, office, garden room, bar or studio. These normally count as permitted development, so no application is needed, as long as it meets these conditions: it sits behind the house, it’s a single storey, it’s no more than 2.5m tall where it’s within 2m of a boundary, it takes up no more than half the garden, and it has no veranda or raised platform. Listed properties, conservation areas and AONBs come with stricter rules. If anyone will sleep in it or it will be let out, full planning permission is always required. This is guidance for England, and Scotland, Wales and Northern Ireland have their own rules. Check with your local planning authority every time, and think about getting a Lawful Development Certificate if you want certainty.
Can I sleep in it, or use it as an annexe or Airbnb?+
You can, but only with full planning permission and Building Regulations approval, every time. That applies to anything slept in or let out, whether it’s an annexe for family, a holiday let or an Airbnb. Building Regs cover the insulation, ventilation, fire safety and the way services are put in. If you’re thinking about a room for sleeping, talk to us first and we’ll go through what it involves for your site. The permission itself always comes from your local authority.
Will Building Regulations apply?+
Generally not, if the building is detached, has under 15m² of floor space inside and nobody sleeps in it. From 15m² up to 30m², conditions apply, mostly to do with fire and how close it sits to a boundary. As soon as there’s sleeping accommodation, full Building Regs apply. Whatever the size, electrical work always falls under Part P, and every build we do is wired to it. Your local authority’s building control team can confirm your particular case, and you should always check with them.
Does it need foundations, and how do you site it?+
In most gardens, not proper foundations. The container is structural by itself, so we usually rest it on a basic prepared base or levelled concrete pad stones. There’s no digging and no waiting for concrete to set. If your ground is soft or on a slope, we’ll tell you what base it needs. Then the unit is craned into place, levelled and left ready to use.
How does it get delivered, and what access is needed?+
It arrives on a HIAB, which is a lorry with its own crane. The crane swings the container over walls, hedges and fences, so the lorry doesn’t have to get right up to the spot. It does need to get reasonably close, with space overhead for the crane to work. Awkward access can normally be worked around, and we talk it through with you ahead of the day so nothing catches anyone out. We deliver all over the country from Radcliffe.
How long will it take?+
We keep our own stock of quality containers, so your build can begin once it’s agreed instead of waiting on a supplier, and that keeps our lead times shorter than most. How long it takes depends on the size and spec, and your quote will include a clear lead time. [TBC: typical turnaround in weeks, to confirm with Jack.]

Let’s get your space built.
Share your idea with us and we’ll take it from design through build to setting it down, ready to use.
We reply within one working day · Based in Radcliffe, Greater Manchester · Delivering nationwide